Design-build services.
Commercial design-build that brings design, early pricing and construction together, from your first idea to the finished building.



Have a project in mind?
Let’s talkDesign and construction, connected.
Design-build brings design, early pricing and construction into one coordinated process, with Kahn carrying the plan from idea to finished building.

Plan together.
Align your goals, site needs and design team.
Price the options.
Use early pricing to guide materials and building systems.
Carry it through.
Keep design decisions connected to the work on site.
Design-build questions, answered.
How design-build connects the design team, construction budget, owner decisions, and work on site.
What is commercial design-build?
Commercial design-build is a delivery method that brings design and construction under one design-build agreement with the owner. Kahn’s design-build approach connects early pricing, coordinated design decisions, and construction for new commercial buildings.
The arrangement gives the project a coordinated path from planning into the build, while architects, engineers, and trade partners still perform their defined roles. The agreement should establish the design scope, construction scope, team responsibilities, pricing terms, and owner approvals. Design-build describes how the project is delivered, not a particular building type or finish level.
How is design-build different from design-bid-build?
In design-build, the owner contracts with a design-builder for design and construction together. In a traditional design-bid-build arrangement, the owner typically holds a separate design contract, completes the design, and then procures construction through a separate contract.
Design-build allows construction input and pricing to inform design decisions within a coordinated team. The best approach depends on the owner’s priorities, procurement requirements, existing team, and desired level of involvement. Compare responsibilities and commercial terms in the proposed agreements instead of assuming the delivery method alone guarantees a lower cost or shorter schedule.
Can Kahn work with an architect or engineer we already have?
An existing design team does not prevent a conversation with Kahn about project delivery. Share the drawings, current design agreements, and team roles so the owner and project team can determine how construction coordination should fit around the work already underway.
A project with separately contracted design professionals may suit construction management or general contracting rather than changing to design-build. If a design-build arrangement is proposed, clarify the contractual structure and professional responsibilities before proceeding. Do not assume design services transfer automatically between firms or that every consultant is included in the construction scope.
Explore construction management alongside an existing design team
How is the budget developed during design-build?
A design-build budget develops alongside the building program, drawings, systems, and material selections. Early pricing helps the owner and design team evaluate alternatives before those choices are fixed, including options considered through value engineering.
Review the assumptions, allowances, exclusions, and information supporting each estimate. A preliminary budget is not automatically a fixed price or guaranteed maximum price. The project agreement should identify how and when construction pricing is established, what is included, and how changes or unresolved conditions affect cost and schedule.
Is design-build faster than a traditional construction process?
Design-build can improve coordination by bringing design and construction planning together, but it does not guarantee a faster opening. The actual schedule depends on design progress, owner decisions, permitting, site conditions, long-lead equipment, and the sequencing allowed for the project.
Some activities may be planned in parallel when the scope and approvals support it. Others must wait for decisions or completed reviews. Ask for a schedule that explains these dependencies and the owner’s decision deadlines rather than treating overlapping design and construction as permission to start unapproved work.
Let’s build what’s next.
Tell us what you have in mind.