Tenant improvements & commercial interiors.

Tenant improvements and commercial interiors for offices, restaurants, retail and fitness spaces. Kahn coordinates your buildout with the owner, landlord and design team.

Have a project in mind?

Let’s talk

A space that works
for your business.

Tenant improvements adapt an existing commercial space for the business moving in, from offices and shops to restaurants and fitness studios.

Layout, building systems and finishes, coordinated with your owner, landlord and design team.

Interior at Blue Island Oyster Bar
Workspace at Park Co-Working on South Gaylord Street

Tenant improvement questions, answered.

Plan a commercial buildout with clearer expectations for the space, landlord coordination, budget, and opening.

What are tenant improvements and commercial interior buildouts?

Tenant improvements adapt an existing commercial space for a business’s intended use. A buildout can include changes to layouts, finishes, building systems, accessibility features, and other work defined by the project’s drawings and scope.

Kahn’s tenant improvement and commercial interior work includes offices, restaurants, retail, and fitness spaces, coordinated with the owner, landlord, and design team. A light renovation and a complete conversion involve different requirements. Establish what the existing building provides and what the business needs before comparing contractor prices or setting an opening date.

How much does a commercial tenant buildout cost?

Tenant buildout cost depends on the condition of the existing space, the proposed use, the layout, required systems, finish selections, and the extent of demolition and alteration. A space that already supports the intended use may need different work from one requiring substantial mechanical, electrical, plumbing, or structural changes.

Clarify which costs sit with the landlord, tenant, and contractor, and identify owner equipment, design fees, approvals, allowances, and exclusions. Kahn can discuss estimating around your actual space and plans. A generic square-foot allowance does not establish the full cost of making a particular property ready for your business.

How long does a tenant improvement project take?

A tenant improvement schedule includes planning, design, landlord coordination, permit review where required, procurement, construction, inspections, and turnover. The duration depends on the condition of the space, proposed use, scope of work, equipment availability, and the approvals needed for the project.

Work backward from the desired opening and account for the period before construction can start. Lease milestones, access restrictions, owner-supplied equipment, and changes to the design can affect sequencing. Kahn can discuss a project-specific approach, but a desired opening date should not be treated as a confirmed construction schedule before these dependencies are understood.

Do commercial interior renovations need permits?

Commercial interior renovations may require permits and inspections depending on the work and the jurisdiction. Changes to the layout, building systems, structure, or intended use can affect the review requirements even when the work is inside an existing building.

Landlord consent does not replace government approval. Confirm the requirements for the actual property with the relevant building and other reviewing authorities, and assign responsibility for drawings, applications, fees, comments, and inspections. Kahn coordinates its construction role with the owner and design team under the project agreement; a renovation should not be assumed exempt because it does not add floor area.

Check Centennial’s commercial building permit resources

Can our business stay open during a commercial renovation?

An occupied renovation may be possible when the work can be separated and sequenced safely around the business, but it depends on the specific scope and building conditions. Demolition, dust, noise, access, utility shutdowns, and required exits can all affect whether continued operation is practical.

Discuss operations, landlord restrictions, neighboring tenants, working hours, and the impact of phased construction before setting the plan. Required safety and occupancy conditions still apply. Kahn can evaluate coordination needs with the project team, but uninterrupted business operations or after-hours work should not be assumed without an agreed approach and scope.